Why Germany's Nuclear Phase Out is Leading to More Coal Burning


In September 2012 Germany's Environment Minister opened a new lignite power plant, arguing the following: “If one builds a new state-of-the-art lignite power plant to replace several older and much less efficient plants, then I feel this should also be acknowledged as a contribution to our climate protection efforts.

Peter Altmaier is not alone, recently the climate benefits of Germany's new and apparently ultra-efficient coal power plants have been extolled not only by manufacturers such as Siemens and power companies including RWE, but even some of the German nuclear phase out's most vocal proponents.

We are also now seeing increasing numbers of people suddenly noticing an uptick in coal power, and deciding it has little to do with Germany's decision to move away from nuclear energy. These arguments however require both an alternative arithmetic, and an alternative history. Here is why.

In the aftermath of Fukushima, Germany prematurely shut 8 nuclear power plants. Respect for arithmetic and the intelligence of my readers dictates that I do not explain why this should lead to an increase in carbon dioxide emissions. However, the relationship between Germany's nuclear phase out and the construction of new coal power plants deserves an explanation.

Between 2011 and 2015 Germany will open 10.7 GW of new coal fired power stations. This is more new coal coal capacity than was constructed in the entire two decades after the fall of the Berlin Wall. The expected annual electricity production of these power stations will far exceed that of existing solar panels and will be approximately the same as that of Germany's existing solar panels and wind turbines combined.

  • Solar panels and wind turbines however have expected life spans of no more than 25 years. 
  • Coal power plants typically last 50 years or longer
At best you could call the recent developments in Germany's electricity sector contradictory.

(Coal production: author's calculation based on 80% load factor projected by Pöyry. Wind and solar production from Fraunhofer ISE. )

These new power plants are sometimes blamed by nuclear proponents on the post-Fukushima decision to shut all nuclear power plants by 2022. This is a myth. Any large piece of infrastructure takes a long time to build, and Germany simply could not respond to Fukushima by building new coal power plants at this scale and speed. Investment decisions for these power plants were made in 2005-2008 (see table 2 here). In response supporters of the nuclear phase out claim this shows that construction of new coal power plants have nothing to do with Germany's decision to phase out nuclear energy. This however is historical revisionism.

A terse history lesson. In the year 2000 the government of Gerhard Schröder announced that all of Germany's nuclear power plants must close by 2022, and this was passed into law in 2002.. This policy was revised by Angela Merkel in September 2010 to extend the lives of nuclear power plants so that the phase out would occur by 2032. Then after Fukushima, Merkel wisely or opportunistically - take your pick - decided to revert largely to the earlier phase out plan, closing eight nuclear power plants immediately and ruling that all would close by 2022.

The policy to phase out nuclear power was vital to the decisions to build new coal power plants. Closing down a quarter of your electricity generation leaves a gap that must be filled by something, and Germany realised it would largely have to be filled by one thing: coal. This is more or less beyond doubt, because Germany's then Environment Minister Sigmar Gabriel said so. Gabriel, now Germany's Minister for Energy and Economics told climate scientist James Hansen that Germany had to build new coal power plants because of its nuclear phase out, and stated elsewhere that Germany would have to build 8 to 12 coal power plants to replace its nuclear fleet.

And this is exactly what he got. In the first half of this decade Germany will open 9 new coal power plants.

By Robert Wilson
Posted January 20, 2014